cruise-image
OLA Cruise

NS Yakutia icebreaker

ClassCruise Ship
Flag state-
Maiden Voyage Date2024
Cruise Age0
Cruise LineRosatom-Rosmorport Russia
Category-

Ship statistics

Gross Tonnage33,540t
Deck Levels8
Crew-to-Passenger Ratio1:1.20
Length173m/567.59ft
Decks with cabins5
Passengers-to-space ratio-
Width34m/111.55ft
Cabins64
Ice Class-
Passengers128
Displacement-
Inflatable boat-

Current position

Call sign
Draught of a vessel
Bow heading
IMO
Lat0°0'00.0"N
Lon0°0'00.0"E
MMSI
Nav statusOther

Introduction to the cruise

On 23 August 2019, FSUE Atomflot signed a contract worth over 100 billion rubles (about US$1.5 billion) for the construction of two additional Project 22220 icebreakers with Baltic Shipyard.[1] As before, the Saint Petersburg-based shipyard was the only bidder for the construction of the nuclear-powered icebreakers.[20]

The keel of the fourth Project 22220 icebreaker was laid on 26 May 2020[3] and the vessel was launched on 22 November 2022.[4] The icebreaker, named Yakutiya (Russian: Якутия) after the Republic of Sakha (Yakutia), is scheduled to be delivered by December 2024.[5]